NEWS

Renewables, storage and EVs push back against weight of GB grid charging reforms

Renewables, storage and EVs push back against weight of GB grid charging reforms

Have you been trying to get your head around what Ofgem’s minded to position on the Targeted Charging Review means for you? Nithin Rajavelu explains Everoze’s brief assessment on what this means for battery storage, renewables and electricvehicles/V2B

Read More >

Refreshing blend or toxic technology cocktail?

Battery storage is racing even faster than the PV market did a few years ago. Costs are plummeting, and new production lines are popping up all around the world. But the technology battle is far from over, says Everoze partners Ragna Haupt-Schmidt in her new article.

Read More >

Battery Storage in the GB Capacity Market

The latest T-4 auction for the GB Capacity Market closed last week. How did batteries fare this time round? We lay it out for you in 3 graphs.

Read More >

Shock prices in UK Capacity Market drive Battery model 2.0

Are you ready for battery model 2.0? The shock low UK Capacity Market price of £8.40/kW/yr is prompting creative solutions – read Everoze’s analysis here

Read More >

The DSO transition is raw and real – and it’s turning infrastructure investment upside down

The transition from DNO to DSO is bitingly fundamental. Read Everoze’s views here

Read More >

UK Capacity Market: 4.7GW batteries have prequalified for T-4 but can creative sector bounce back from de-rating debacle?

The UK’s Capacity Market (CM) Prequalification Registers and De-rating Consultation Response are finally out – and contain a few surprises for the battery storage industry. In this blog, we summarise Everoze’s takeaways from these two landmark publications.

Read More >

Everoze launches ‘Batteries: Beyond the Spin’ report on digital inertia

New report authored by Everoze finds battery-based energy storage could deliver significant savings for Irish and Northern Irish electricity system with ‘digital inertia’

Read More >

Battery sizing: oversize, augment, reduce or repower?

How big is too big? Fliss Jones brought the whole Everoze storage team into one room to settle the matter, once and for all.

Read More >

So you’ve built your battery project – now what?

With >400MWh battery projects due to come online in the UK in the next 18 months alone, it’s time to plan how to track whether these projects are performing.

Read More >