Technical Advisor during the construction of Bialy Bor 144MW wind farm in Poland
Published April 2022
Everoze was delighted to act as Biały Bór Farma Wiatrowa’s technical advisor for the construction of a 144.9MW wind farm developed and built by Uriel. The wind farm is owned by Mirova(1) and Uriel and consists of 42 V126 WTGs.
Construction started in July 2020 and the wind farm was commissioned in March 2022. During these almost 2 years of construction, Everoze and its partner Cameo, supported by local partner Ensovia, performed extensive construction monitoring including:
- construction follow up;
- monthly and ad hoc site visits;
- transformer FAT attendance and support;
- review of technical documentation;
- review of contracts amendments;
- budget and contingencies follow up; and
- review of take over documentation.
Specific support was provided in relation to grid connection and associated administrative processes.
Through proactive and reactive approach, Everoze supported the wind farm by making sure the various challenges that it faced during construction (global context of COVID-19, challenging grid connection process) were successfully managed.
Adriano Tutello, Investment Manager at Mirova(1) mentions: “Everoze’s team, as technical advisors, provided extensive knowledge and responsiveness to support us in our second largest investment in Poland. Their diligence allowed us to move forward smoothly despite the difficult sanitary conditions faced during the construction of the wind farm. It is always a pleasure to work with Everoze’s fully committed and professional team”.
The services were performed by Everoze partners Justine Malafosse and Christophe Campistron, Benjamin Charf from our French partner CAMEO and by our local Polish partner ENSOVIA.