Everoze was delighted to advise Glennmont Partners on the technical side of a 16.8MW French onshore wind farm acquisition.
Everoze was delighted to act as independent engineer on behalf of Belectric Solar Ltd for the National Grid commissioning tests at Foresight’s 10MW Nevendon Battery Storage Project in Essex
Everoze was delighted to advise Mirova on the technical side for the acquisition of the Spanish 300MW Goya Project – the first premium and public subsidy free wind farm
Everoze is pleased to have been technical advisor to J-Power in its acquisition, at the outset of the construction phase, of a stake in the 860MW Triton Knoll Offshore Wind Farm
Everoze advised ENGIE on the acquisition of Langa solar and storage portfolio made up of 720 sites with a total power of 1.280 MWp
Everoze was delighted to verify the contractual availability of the PV projects from two German investors.