Rules around Extended Performance Tests for BESS assets in the Capacity Market look like they are here to stay. Jamie Stewart describes the options available for project owners.
CIP asked Everoze to support it in the staged acquisition of the 500MW, 400kV Coalburn 1 BESS project as well as with the parallel procurement and contracting process, to reach Financial Investment Decision (FID)
The PV and battery storage industry in Southeast Asia has come a long way in the past decade. Ragna Schmidt-Haupt outlines the 5 factors for success, the newest of which has the potential to become the next big thing, and not only in Southeast Asia
Thrive Renewables requested Everoze to provide owner’s engineering support during the detailed design, construction and commissioning phases of its 20MW, 1.5 hour Feeder Road BESS project in Bristol
Having changed country, company and technology, Dougal McQueen shares his thoughts on the rapid deployment of Battery Energy Storage Systems into legacy power systems
Everoze was pleased to support the development of one of Europe’s largest battery storage facilities through a detailed review of the positive carbon impacts of the proposed project.
Many technologies claim to be cheaper than Li-ion and thus better suited to long duration energy storage, but each has it’s own drawbacks and challenges. David Thomason looks into some of the challengers
While Li-ion battery fires are a real risk, this risk is manageable as we learn more about the fires themselves and develop more bespoke battery engineering solutions, Jamie Shaw-Stewart explains.
Is local manufacturing of Li-ion batteries desirable or even necessary? Jamie Shaw-Stewart explores some technical and geopolitical issues around it