Everoze’s last assessment reveals a 5.1% gap between the actual production of the wind farms and pre-construction energy production assessments. Fatima Grondona explains more in her latest article.
Everoze has delivered its first human rights impact assessment for Boralex eight wind farms located in Metropolitan France
Everoze delivered a climate risk and vulnerability assessment to Octopus Renewables Limited. We worked with climate modelling specialists Climate Scale to conduct a project specific review of the climate risks associated with the long-term environment at each asset site
Everoze was delighted to act as Biały Bór Farma Wiatrowa’s technical advisor for the construction of a 144.9MW wind farm developed and built by Uriel. The wind farm is owned by Mirova(1) and Uriel and consists of 42 V126 WTGs.
Everoze was delighted to advise Octopus Renewables on the acquisition of a 31.5MW wind farm located in Marhult, Sweden. The project was developed by OX2 and consists of 7 Vestas V150 4.5MW.
Everoze was delighted to advise BPCE ENERGECO on the debt financing of Tulipes, Oeillets and Bleuets wind farms developed and built by H2AIR
Everoze was delighted to advise LBBW on the debt financing of the MYOSOTIS wind farm in Ardennes, France, developed and built by H2AIR comprising 12 Vestas V150 wind turbines for a total capacity of 42.6MW
Everoze was delighted to act as Perfect Wind Polska’s Owner’s Engineer for the construction of a 132MW wind farm portfolio developed and built by Akuo
Everoze was delighted to advise ING on the debt financing of a wind farm located in Kępno County in Poland, totalling 17.8MW