Case Studies

Technical Advisor during the construction of Bialy Bor 144MW wind farm in Poland

Technical Advisor during the construction of Bialy Bor 144MW wind farm in Poland

Everoze was delighted to act as Biały Bór Farma Wiatrowa’s technical advisor for the construction of a 144.9MW wind farm developed and built by Uriel. The wind farm is owned by Mirova(1) and Uriel and consists of 42 V126 WTGs.

Read More >

TA to Octopus Renewables on the acquisition of a Swedish 31.5 MW wind farm

Everoze was delighted to advise Octopus Renewables on the acquisition of a 31.5MW wind farm located in Marhult, Sweden. The p...

Read More >

Tulipes, Oeillets & Bleuets lender technical due diligence

Everoze was delighted to advise BPCE ENERGECO on the debt financing of Tulipes, Oeillets and Bleuets...

Read More >
Wind farm

MYOSOTIS lender technical due diligence

Everoze was delighted to advise LBBW on the debt financing of the MYOSOTIS wind farm in Ardennes, France, developed and built by H2AIR comprising 12 Vestas V150 wind turbines for a total capacity of 42.6MW

Read More >
Biodiversity review on PV pre-construction portfolio

Biodiversity review on PV pre-construction portfolio

Everoze was delighted to provide a first biodiversity review for a pre-construction PV portfolio in Northern Europe. The biodiversity impact analysis focused on two aspects of the portfolio, notably design and O&M.

Read More >

Borssele 3 & 4 technical advisory services

Everoze was delighted to provide technical advisory services to Diamond Generating Europe on the sale of their 15% stake in the Borssele 3 & 4 wind farm to INPEX

Read More >