Everoze was delighted to provide due diligence services to Gresham House for the Longridge, Wickham Market and Thurcroft battery storage projects (each 50MW).
Read More >Everoze staff provided technical support to Thrive during the acquisition process, in particular providing the technical elements of the main EPC and O&M contracts, including warranties.
Read More >The Crown Estate engaged Everoze to survey the evolving technology landscape to assess how practical limits to offshore wind installation will develop between now and 2040. Read more about Broad Horizons here.
Read More >Everoze’s work with Distribution System Operator (DSO) Western Power Distribution is a first for the industry, allowing a comparison of the carbon impacts of different local flexibility technologies.
Read More >Everoze has completed a study to provide the Scottish Government with a detailed review of issues and an evidence base for grid-scale battery projects which is relevant to policymakers, including sustainability, resource constraints and recycling, the impact on electricity systems, and issues for spatial planners.
Read More >Everoze was delighted to advise Octopus Renewables, on the acquisition of a 120MWp portfolio of 14 projects in France. The projects were acquired at operational stage and have been commissioned between 2013 and 2015.
Read More >Everoze was delighted to be commissioned by Low Carbon Hub to lead two workshops on corporate PPAs for local authorities and university representatives.
Read More >Great to advise the lending group on the refinancing of this large NTR onshore wind portfolio. Congratulations to the NTR team and everyone involved.
Read More >Everoze was delighted to advise Capital Dynamics on the acquisition of a 100% stake in the Spanish 133MW Puerto Real 1 project developed by WElink Group.
Read More >