To deliver on the Floating Offshore Wind (FOW) Vision, we will have to develop the industrial base and associated infrastructure, whilst simultaneously grappling with cost reduction pressures
It’s always exciting to see an ambitious “moonshot” target, and this week’s 2030 vision report by NESO is certainly that – So how do we feel about that?
Developers are contending with big delivery risks right now, and the successes of Round 4 and ScotWind seem a long time ago. Graeme Wilson explains 3 big mines developers are trying to avoid – all with limited time and information
Everoze was delighted to advise BPIfrance, La Banque Postale et BPCE Energeco on the technical side for the debt refinancing of a +100MW French brownfield Akuo portfolio including 5 wind farms in mainland France and 4 solar plants with storage capacity on Corsica and Reunion islands
Everoze was delighted to advise Total on its acquisition of an 80% stake in the Erebus floating offshore wind project, which is located in the Celtic Sea in Wales
Everoze was delighted to advise the lenders led by the Talanx Group on the technical side on the EUR 510.6 million green bond refinancing of CPP Investments’ minority interest in the Hohe See and Albatros offshore wind farms in Germany.
After a very interesting deal was concluded last month for Hollandse Kust Zuid by chemicals giant BASF, here are some thoughts by Everoze partner Graeme Wilson on what this transaction might mean for the offshore wind industry and developers in particular.
Everoze was delighted to support the ADEME (French environmental and energy agency) in a recent technical-economic study on the end of life potential of French wind farms.
Everoze was delighted to act as technical advisor to EnBW in their acquisition of Valeco, a French developer of wind & solar photovoltaic projects.